Buildings and Grounds
Tony Breen, Director of Facilities
abreen@mrsd.org
603-903-6962
Bob Johns, Maintenance Supervisor
rjohns@mrsd.org
603-903-6968
Access to the work order system:
myschoolbuilding.com
ASBESTOS HAZARD EMERGENCY RESPONSE ACT (AHERA)
In compliance with AHERA, the Monadnock Regional School District is required to notify parents, teachers, and all other building occupants that an Asbestos Management Plan (AMP) is available to them in either the office of each school or in the SAU #93 office. The AMP details the location of asbestos in each building and provides a record of inspections, re-inspections, periodic surveillance, and removal of asbestos.
Periodic surveillance of Asbestos Containing Building Material (ACBM) is conducted by district personnel every six months and a thorough re-inspection of ACBM is conducted once every three years by the District’s environmental consultant. The most recent inspection was conducted in June 2020. AHERA Asbestos Reinspection 2.21.2024
If you require more detailed information, please call the SAU office at 603-352-6955 and staff will direct your inquiry to the District’s designated person for asbestos information.